Abdenour, J I (2021) A cost estimation model for improving the budget estimates of industrial plant construction projects, Unpublished PhD Thesis, , The George Washington University.

Adoko, M T (2016) Developing a cost overrun predictive model for complex systems development projects, Unpublished PhD Thesis, , The George Washington University.

Alves, L F (2006) Stochastic approach to risk assessment of project finance structures under public private partnerships, Unpublished PhD Thesis, , The George Washington University.

Bersson, T F (2012) A framework for application of system engineering process models to sustainable design of high performance buildings, Unpublished PhD Thesis, , George Washington University.

Boyer, E J (2012) Building capacity for cross-sector collaboration: How transportation agencies develop skills and systems to manage public-private partnerships, Unpublished PhD Thesis, , The George Washington University.

Charoenphol, D (2017) Using robust statistical methodology to evaluate the performance of project delivery systems: A case study of horizontal construction, Unpublished PhD Thesis, , George Washington University.

Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches, Unpublished PhD Thesis, , The George Washington University.

Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects, Unpublished PhD Thesis, , George Washington University.

Farmer, C M (2018) Constructing program management offices for major defense acquisition programs: Factors to consider, Unpublished PhD Thesis, , The George Washington University.

Griffin, M G (2008) The lived experience of first line managers during planned organizational change: A phenomenological study of one firm in the residential construction industry, Unpublished PhD Thesis, , The George Washington University.

Holmlin, R M (2016) Pre-design methodology for establishing scope-budget and scope-duration alignment for capital projects, Unpublished PhD Thesis, , George Washington University.

Innocent, M J F, Jr. (2018) Predicting military construction project time outcomes using data analytics, Unpublished PhD Thesis, , The George Washington University.

Joao, Z R (2021) Road construction assessment model (RC-AM) to prevent contract overbilling in Angola, Unpublished PhD Thesis, , George Washington University.

Kim, E (2000) A study on the effective implementation of earned value management methodology, Unpublished PhD Thesis, , The George Washington University.

Krone, S J (1991) Decreasing the impact of changes, Unpublished PhD Thesis, , George Washington University.

  • Type: Thesis
  • Keywords: duration; fragmentation; market; construction site; litigation; pricing; architects; case studies
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/303960216
  • Abstract:
    This study formulates a change order process that promotes efficient administrative performance and addresses the daily demands of changes in the construction industry. U. S. construction output has declined with the fragmentation of management resources as illustrated by the increase of courtroom battles and loss on the worldwide construction market. The construction contract is the binding agreement between parties that specifies the requirements for contract performance. The change order process has contributed to the increase in litigation and decline in production. This process can cause a localized problem on a construction site to spread into other areas. This study investigates the construction change order process through a review of construction case studies, literature covering 1975-1990, and construction at the University of Maryland during 1987-1990. The analysis develops digraphs of the change order process to determine the cause and extent of possible damages resulting from it. A hypothetical process is tested through a comparison with the American Institute of Architects' change article. The contractual analysis technique (CAT), which is a matrix addition of the procedures represented in the digraphs, is also employed. The findings suggest that the change clause of the general conditions should emphasize early proposal pricing. CAT found that early notification and submission of proposals maintains management control and avoids impact claims. The research in developing this change order process places more emphasis on the contractor's proposal, shortens the notification and proposal durations, and establishes a change order allowance in the bid process. The CAT lays the foundation for future contract change clauses in construction management.

Lounsbury, C R (1983) From craft to industry: The building process in North Carolina in the nineteenth century, Unpublished PhD Thesis, , The George Washington University.

McDavid, H A (1996) Construction and economic development: A stimulus or constraint in developing countries, Unpublished PhD Thesis, , George Washington University.

Momtazi, S (2021) Reducing cost overruns in construction projects using lean methodology, Unpublished PhD Thesis, , George Washington University.

Ngamthampunpol, D (2008) An assessment of safety management in the Thai construction industry, Unpublished PhD Thesis, , The George Washington University.

Park, J (2015) Essays on the delivery of public infrastructure projects: Empirical analyses on transportation projects in Florida, Unpublished PhD Thesis, , The George Washington University.

Reid, J S (2019) Evaluating the impact of using agile methodologies in heavy-civil construction, Unpublished PhD Thesis, , George Washington University.

Schulte, W D, Jr. (1999) The effect of international corporate strategies and information and communication technologies on competitive advantage and firm performance: An exploratory study of the international engineering, procurement and construction (IEPC) industry, Unpublished PhD Thesis, , The George Washington University.

Shamma, E M (1988) A dynamic model for the growth of construction firms, Unpublished PhD Thesis, , The George Washington University.

Stuban, S M F (2011) Employing risk management to control military construction costs, Unpublished PhD Thesis, , George Washington University.

Taku, A M (2021) Predicting modular efficiency in oil and gas capital projects using multi-criteria decision analysis, Unpublished PhD Thesis, , The George Washington University.

Toliver, B L (2018) Implementing project management plans to control construction costs on military projects in Korea, Unpublished PhD Thesis, , George Washington University.

Tonimoghadam, F (2021) A predictive model for reducing cost and time for the detection of clashes in residential and commercial constructions projects, Unpublished PhD Thesis, , George Washington University.

Wenzelberger, J P (1987) The economic analysis of tall buildings (Milwaukee, Wisconsin; Boston, Massachusetts; Kansas City, Missouri), Unpublished PhD Thesis, , George Washington University.

Zhou, G (2021) Machine learning-based cost predictive model for better operating expenditure estimations of U.S. light rail transit projects, Unpublished PhD Thesis, , The George Washington University.